A workplace move can affect every part of the working day. Phones need to stay answered, systems need to stay live, staff need clear instructions, and the old premises must be left in the right condition. This workplace move timeline guide gives office managers and business owners a practical way to plan the job without leaving everything until the final week.

The right schedule depends on the size of your team, the amount of furniture and equipment involved, and whether you are moving locally in Manchester or further afield. A small office may be ready in a few weeks. A larger relocation with servers, storage, multiple departments or strict building access rules needs longer. The aim is the same: reduce downtime, protect your equipment and keep people informed.

8 to 12 weeks before: survey the move and set responsibilities

Start by walking through both sites. Measure doorways, lifts, corridors, stairwells and loading areas. Check where removal vehicles can park, whether permits are needed and what times each building allows access. These details can decide whether a move runs smoothly or becomes delayed before the first desk is loaded.

Make a full list of what is going with you. Include desks, chairs, filing cabinets, meeting room furniture, stock, kitchen items, IT equipment and any specialist machinery. At the same time, identify what will not make the move. Old furniture, broken equipment, unwanted files and surplus stock can take up valuable space and add unnecessary removal costs.

Choose one person to coordinate the move, with a contact from each department. They do not need to carry out every task themselves, but they should be able to make decisions quickly. Give each department a deadline for confirming equipment, personal belongings and items for disposal.

This is also the right time to request a detailed removal quote. Be clear about floors, lifts, access restrictions, packing requirements, disposal needs and the destination address. A proper survey helps avoid surprises on moving day. A & S The House Movers Ltd can provide practical office relocation support, including furniture moves, packing help and licensed removal of unwanted items.

6 to 8 weeks before: plan IT, services and the new layout

IT is often the part of a workplace move that causes the most disruption. Speak to your IT provider early and agree who is responsible for disconnecting, transporting and reconnecting equipment. Servers, network hardware, monitors, printers, phones and confidential drives need careful handling and clear labelling.

Confirm when broadband, phone lines, alarms and access systems will be active at the new premises. It is worth allowing overlap where possible, particularly if your business relies on calls, online orders or customer support. If the new connection is delayed, you may need temporary mobile broadband or a short period of remote working.

Create a floor plan before the move. Mark where each department will sit, where power points are, and where shared equipment such as printers and meeting room screens will go. Numbering desks or zones makes unloading much quicker. Rather than asking a removal team to place items wherever there is space, you can direct each labelled item to its final location.

Tell staff what is expected of them. They may need to clear desk drawers, take home personal belongings, back up files or pack non-sensitive paperwork into labelled boxes. Give simple instructions and a cut-off date. Clear communication prevents the last-minute rush that leaves important items unlabelled.

3 to 5 weeks before: clear out what you no longer need

Moving unwanted items costs time and money. A planned clearance before relocation gives you a cleaner start at the new office and makes the final removal load easier to manage.

Sort items into four groups: keep, recycle, donate or dispose of. Be especially careful with confidential paperwork, hard drives and company records. Your business may have retention obligations, so do not dispose of files until the relevant person has approved it. For electrical items and commercial waste, use a licensed waste removal provider and keep the paperwork for your records.

Furniture is a common issue. Some desks may not suit the new layout, while old cabinets or damaged chairs can be more trouble than they are worth. Removing them ahead of time creates clear routes through the old office and avoids paying to transport furniture that has no place at the new one.

Notify customers, suppliers and service providers of the new address. Update invoices, stationery, online listings, insurance details and delivery instructions. If you receive regular post or courier deliveries, arrange redirection or make sure the new address is in place before moving week.

2 weeks before: confirm the moving day plan

By this stage, everyone involved should know the date, start time and order of work. Confirm access with both buildings, including loading bay bookings, lift use, parking arrangements and key collection. Some managed offices only allow removals outside standard business hours, so check this before finalising the schedule.

Prepare a moving-day contact list with the removal team, building managers, IT provider, security contact and key staff members. Keep it with you, not in a box. If a problem arises, such as a lift fault or a delayed delivery, quick contact can prevent a small issue becoming a lengthy hold-up.

Label every box and item with the destination room or desk zone. A label such as “Marketing – Desk Zone B – Open First” is far more useful than simply writing “Marketing”. Use a separate system for cables and small IT accessories. Each monitor, computer and phone should be easy to match with its leads when it reaches the new office.

Pack an essentials box for the first day. This may include kettle supplies, cleaning materials, toilet rolls, basic tools, extension leads, stationery, first-aid items, keys and important documents. It sounds simple, but having these items immediately available makes the first few hours much easier for staff.

Moving week: protect continuity as well as furniture

The final days should be about confirmation, not major decisions. Check that staff have finished packing their own areas and that confidential documents are secured. Make sure the new workplace is clean, accessible and ready for the removal team.

If possible, move non-essential furniture, archive boxes and spare stock first. This can reduce the volume on the main moving day. Businesses that can work remotely for a day or over a weekend often find it easier to minimise disruption, but that option depends on your systems and customer commitments.

For a busy office, move in stages. One department may continue working while another is packed, then switch once key equipment is installed. This takes more coordination than a single full-day move, but it can be the better choice where shutting down completely is not realistic.

Before the vehicle leaves the old premises, carry out a final room-by-room check. Look in cupboards, under desks, in kitchens, storage rooms and meeting rooms. Take meter readings if required, return keys and photograph the empty space if this is part of your lease handover.

Moving day: keep communication simple and direct

A good moving day is controlled, not crowded. Keep only the necessary staff on site, make sure the removal team has clear access, and have one person available to answer questions. Avoid changing the floor plan halfway through unless there is a genuine issue. Last-minute changes slow unloading and make it harder to find important equipment later.

Ask staff to keep valuables, personal bags and sensitive documents with them where appropriate. Removal teams can handle packed office contents and furniture, but employees should remain responsible for items they need during the day.

At the new premises, unload according to the labels and floor plan. Start with essential work areas, IT equipment and shared facilities. Once desks and systems are in place, deal with non-urgent archive boxes, decorative items and surplus storage. Trying to unpack everything at once usually creates clutter and confusion.

The first week after the move: settle in and close off loose ends

Test internet connections, phones, printers, access cards, alarms and meeting room equipment. Ask each department to report missing items or faults promptly, while everyone still remembers what was packed. Small issues are easier to resolve in the first few days than a month later.

Arrange collection of empty boxes, packing materials and any remaining waste rather than allowing it to build up in corridors or storage areas. Keep your new workplace safe and presentable from the start.

A workplace move does not need to stop the business in its tracks. Give yourself enough time, deal with unwanted items early, and use a removal team that understands access, care and timing. With a clear plan, your staff can arrive at the new office ready to work, not still searching for the kettle or a missing monitor.

Share this post

Subscribe to our newsletter

Keep up with the latest blog posts by staying updated. No spamming: we promise.
By clicking Sign Up you’re confirming that you agree with our Terms and Conditions.

Related posts